Cells in at one end, tested packs off the other — one takt across both segments +86 15327155363 [email protected]
Pull-test coupons cut from busbar welding station first articles, laid out on the qualification bench

BLP-W6 — station 13 of seventeen, in-line

The BLP-W6 In-Line Busbar Welding Station

A three-axis gantry carries a galvanometer scanner over a 6 kW source and welds every busbar joint on a module that never leaves its carrier. What the surface hides — 1.0 mm of fusion under a 1.5 mm seam — is sectioned, pulled and written to the module number.

In-line, on the carrier

In-Line Busbar Welding Station BLP-W6

BLP-W6 is station 13 of the seventeen in the module segment. The module arrives located on its carrier, the gantry carries the scanner across it, each joint is welded where the station was told it would be, and the module continues to station 14 on the same carrier. Nothing is lifted, re-clamped or re-found in between.

Who it is built for

Plants building a new module line, and engineering teams putting a busbar welding station into a line already running. Fully automatic on both configurations.

Inside 24 hoursSend the module drawing, the busbar part number with material and section, and the row configuration — the reply says what this station is for your module.
BLP-W6 busbar welding station: three-axis gantry carrying the galvanometer scanner over the module carrier
Carrier holds the module; gantry moves the beam.
6 kW sourceThree-axis gantryGalvanometer scannerAUTO on both configurationsSingle-row and double-row
In-line welding head with its galvanometer scanner hanging from the gantry bridge directly above a module on its carrier, busbar plate seated across the terminal rows
Joint map and terminal centres come from upstream; the carrier keeps the datum; the scanner only welds.

Three things under the figures

Recipes are stored by part number and selected, never written, at the station.
Recipe number, actuals, nitrogen flow and every seam’s sequence number and timestamp go by module number over PROFINET to your MES.
Station 14 measures fusion width on 100% of modules; one module per shift is sectioned for depth.

Stations 11 to 16

Inputs Handed to Station 13

A busbar welder is bought as a machine and lives as a station. Almost everything it needs is decided before a module reaches it.

Station 11, BLP-AD terminal addressing and laser cleaning set
STATION 11

Terminal addressing

BLP-AD vision at 200–300 mm/s locates every terminal to ≤±0.2 mm, checks polarity, laser-cleans the faces.

AUTO
Station 12, busbar plate and CCS assembly seated on the module
STATION 12

Busbar and CCS seating

Busbar plate and CCS assembly seated on the module. Manual on the economy build, semi-automatic on the high-automation build.

MANUAL / SEMI
Station 13, the BLP-W6 busbar welding station in the module segment
STATION 13

Busbar welding

Every joint welded on the carrier to the recipe of the part number; actuals recorded.

AUTO · this page
Station 14 weld inspection camera looking down on a row of finished busbar seams, a measurement reticle across one seam
STATION 14

Weld cleaning and inspection

Fusion width measured on 100% of modules with seam appearance; written to the module number.

AUTO
Station 15, manual re-check and communication test on the module conveyor
STATION 15

Re-check and communication test

Manual re-check with the CCS communication test: cell voltages read back against the sorting record.

MANUAL
Station 16, BLP-EOL module end-of-line test station
STATION 16

Module end-of-line test

Insulation, hipot, total voltage, internal resistance, continuity — all measured through the joints made here.

AUTO

The handover from station 11

This station is told where each joint is; it does not go looking for it. A weld criterion is only as repeatable as the datum it was measured against, and that datum is set one station earlier at terminal addressing. The ≤±0.2 mm figure upstream and the fusion figures here are the same argument.

What leaves is the module’s electrical path: everything the module and pack end-of-line tests measure is measured through these joints.

Joint mapoff your module drawing, stored with the busbar part number
Terminal centresoff the station 11 addressing record, ≤±0.2 mm
Polaritychecked at station 11 with the same optics; a wrong-polarity module never reaches the scanner
Datumthe carrier that located the module for addressing still holds it

Nine lines, three ways of proving them

Published Figures of the Busbar Welding Station

Two figures describe the machine and three describe the joint, obtained in three different ways. That difference decides what your inspector checks every shift and what only a sample can answer.

FigureValueWhat it governsProved by
Laser source6 kWCapability at the joint: room in the parameter window when your busbar is thicker or more reflective than a blueprint one.machine
Weld speed50–100 mm/sThe window a recipe is written inside. Your point in it is settled against busbar material and section; the speed used is recorded per module.machine
Fusion depth≥1.0 mmThe criterion under the surface. Held by first-article sectioning and by one sectioned module per shift.section
Fusion width≥1.5 mmThe criterion checked on every module, at station 14, with weld appearance.100% visual
Joint pull strength≥1000 NThe destructive criterion. Proved on samples at qualification and again at site acceptance.samples
Row configurationSingle / doubleBoth run here. What changes is the joint map and the fixture, not the mechanism or the criteria.fixture
MotionGantry + scannerHow the beam reaches each joint while the module stays on its carrier.machine
Automation levelAUTOAutomatic on the economy build and on the high-automation build.line
Shielding gasN₂ 0.5 MPaFlow depends on the configuration; the flow delivered is recorded with the weld.utility

Two describe the machine

6 kW and 50–100 mm/s set the width of the window, not the point inside it.

Three describe the joint

Depth, width and pull strength are what your module gets. The red rows are the ones your quality plan is written around.

6 kW fibre laser source cabinet feeding the in-line welding station
The 6 kW source: the same class that runs the off-line gantry machine qualifying this station’s recipes.

Width every module · depth by section · strength by sample

Three Criteria, Three Verification Jobs

One method read three ways: prove strength on samples, lock the parameters, verify per module that the fusion still has the shape those parameters make.

Station 14 inspection camera above a finished busbar seam with a width measurement reticle laid across it
≥1.5 mm

Fusion width — every module

How
100% visual measurement at station 14, with seam appearance: spatter, porosity, offset from the terminal.
Who
The station, automatically; the operator reads the pass or fail.
Record
Against the module number, so a module that passes carries its own evidence forward.

The criterion your quality team works with day to day: it catches a joint drifting off the terminal before anything downstream sees it.

Sectioned and polished busbar joint coupon in a mounting puck, the fusion zone profile visible below the seam
≥1.0 mm

Fusion depth — first article, then one per shift

How
The first article is sectioned when a recipe is qualified; once running, one module per shift is sectioned to confirm the qualified state still holds.
Who
The process engineer orders it, quality reads and signs it.
Record
Filed with the recipe it belongs to, so depth evidence and parameters never live in two systems.

Depth is under a surface nobody can look at, so it is held two ways, kept together.

First-article busbar coupons welded off line and pulled to 1000 N before the recipe enters the busbar welding station
≥1000 N

Pull strength — on samples

How
The busbar is loaded until the joint gives up: on the first article of a new part, welded off line, and again on your parts at site acceptance.
Who
Process engineer runs it; quality countersigns; at acceptance, both sides.
Record
In the first-article file and in the site acceptance report, value beside criterion.

The test consumes the joint whether it passes or fails. Pulling every joint would not be an inspection plan, it would be a scrapping plan.

Prove strengthon samples, off line
Lock the parameterspower, speed, defocus, gas, seam order
Verify the shape per modulewidth at station 14, depth each shift

The window, not a verdict

Weld Speed Window, 50–100 mm/s

Travel too fast and depth falls short; travel too slow and the seam spreads without gaining anything. The window exists because those two pull against each other. The point inside it is fixed by your busbar material and section at qualification, and stays fixed.

Close view of a laser seam on strip, the bead width the station 14 camera measures
Speed shows in the seam before it shows in a test.
  • The actual speed, power and defocus used on each module are recorded, so a drift is visible as a change in the record, not a surprise at end-of-line testing.
  • A different busbar section gets its own point in the window, qualified on its own first article — never a nudge on the running recipe.

Sequence and timestamp

One Joint, One Record

Written, not reconstructed

Every seam leaves with a sequence number and a timestamp attached to the module number. After this station, correcting anything under the busbar means cutting.

Weld recordper module · PROFINET → MES
MODULE No.carrier
RECIPE No.part number
POWER, actualW
SPEED, actualmm/s
DEFOCUS, actualmm
N₂ FLOWL/min
SEAM 01 … nsequence + timestamp
WIDTH, station 14mm · pass / fail
What the recipe said, what the station did.

Never written on this station

Recipe Source: Off-Line Machine to In-Line Station

A new busbar part’s recipe is born on the off-line gantry laser welding machine, away from the line and from takt, and moves into BLP-W6 unchanged.

01 · BLP-WG

First article, off line

Welded on the off-line machine while the line keeps running.
02 · SAMPLES

Pulled to ≥1000 N

Samples from that first article are loaded to failure against the strength criterion.
03 · SECTION

Sectioned for ≥1.0 mm

The article is cut and the fusion depth measured; the record is filed with the recipe.
04 · SIGNED

Engineer writes, quality signs

Same recipe format, same two signatures the in-line station will carry.
05 · BLP-W6

Into the line, unchanged

Nothing is re-tuned on the way in. The line runs the recipe that was qualified.
BLP-WG off-line gantry laser welding machine where first articles are welded
01 · The off-line machine. First articles, rework and short runs, while the line runs on.
First-article busbar coupons ready for the pull test
02 · Pull samples from the first article, loaded until the joint gives up.
Polished cross-section coupon of a busbar-to-terminal joint held in a mounting puck under a measuring microscope
03 · The section. Depth is read here and filed against the recipe number.

Stored by part number

Recipes are keyed to the busbar geometry, not to a shift, a batch or a machine. That is what makes rework honest: a module back for a repair weld gets the recipe of its original part number, not whatever is loaded at the time.

Two records for every module

The recipe carries the parameters proved together — power, weld speed, defocus, nitrogen flow, seam order — and the station records what it delivered against them, by module number, over PROFINET. When the two agree and the station 14 width check passes, the module is released on evidence.

One regime across every welding station

The same format and the same pair of signatures run on the off-line BLP-WG, the in-line BLP-W6 and the nickel-strip welder on the cylindrical branch.
A plant with an off-line machine and an in-line station is running one set of documents, not two: one recipe list, one first-article file per part number, one signature block.
The list of qualified recipes, each with its sectioning record filed against it, is handed over at acceptance and grows with every new part number.

Three jobs, kept apart

Recipe Rights by Role

A recipe that anyone can nudge stops being evidence the moment it is nudged. The station separates three jobs; the five days of training on your line after site acceptance are built the same way.

Modules on carriers passing through the module segment at takt
OPERATOR

Selects, releases and detains

  • Calls up the recipe for the part number in front of them, starts the station
  • Reads the pass or fail that comes back from the width check
  • Handles any module the line has detained, by its module number
Does not edit parameters. That is what keeps the record meaningful.
Laser source cabinet and parameter panel the process engineer qualifies recipes against
PROCESS ENGINEER

Writes and qualifies

  • Writes the recipe and runs the first article on the off-line machine
  • Orders the pull samples, reads the sections, releases the recipe into the line
  • Investigates when a shift sectioning or a width result moves
Signs the parameters. Quality countersigns every one of them.
External water chiller and gas path serving the laser welding station
MAINTENANCE

Keeps the station in the state the recipe assumes

  • Optics, gas path, fixture condition and the gantry itself
  • Wear parts dispatched inside 48 hours
  • Remote diagnostics for the times when a part is not the answer
Does not touch a recipe. A fixture that moved is fixed, not compensated for in the parameters.
5 daysTraining on your line after site acceptance, one module per role
26 engineersFour on laser and vision — see the about page
48 hWear parts dispatched
RemoteDiagnostics access to the controller

Three inputs

Send the Busbar Layout

Three inputs are enough to say what this station would be in your line, what fixture has to be cut, and how the first article would be qualified. Reply inside 24 hours; the contact page has the direct address.

Module drawing Busbar part No. · material · section Single-row or double-row

0.5 MPa at the interface

Nitrogen at the Joint

Shielding gas is supplied to the line at 0.5 MPa, and this station is where it is consumed. A line that welds more modules per hour uses more gas, so the flow is quoted per configuration.

Flow is part of the recipe

Not a background service. Flow is qualified with the power and speed it was proved with, and recorded per module with them, so a gas problem shows up in the weld record before it shows up as porosity at station 14.

  • Spatter and porosity criteria at station 14 only mean something because the gas condition behind them is a recorded quantity, not an assumption about the day.
  • The supply is yours to arrange in whatever form suits your site. Stated here: pressure and flow at the interface; the full utility schedule is on the layout and utilities page.

Same mechanism, same criteria

Single-Row and Double-Row Modules

Both run on this station. A criterion that relaxed when the work got harder was never a criterion.

Moves with row count

  • The joint map: how many joints, where they sit, the order the scanner welds them in
  • The fixture that presents the module to the station
  • Cycle content at station 13 — more joints take more seconds

Does not move

  • The gantry, the scanner and the 6 kW source
  • ≥1.0 mm, ≥1.5 mm and ≥1000 N — none of them soften because there are two rows to weld
  • The record: seam sequence, timestamp and actuals by module number, on both
Single-row prismatic module with one busbar row across the terminals
Single-row: one row of joints, one fixture.
Double-row module layout with two busbar rows and a longer joint map
Double-row: a longer joint map, a different fixture, the same criteria.
ROUTE A · QUALIFIED PART

Recipe call plus a first-piece check

Between busbar parts already qualified: a recipe call at the station and a first-piece check at station 14. No engineer, no off-line run.

ROUTE B · NEW MODULE TYPE

Off-line first article, then the line

A module type nobody has welded here goes the other way first: off-line first article, samples pulled, section examined, recipe signed, then the line. Station-by-station timing for both routes: cell compatibility and changeover.

Held by module number

A Detained Module’s Record

When station 14 fails a module on fusion width or weld appearance, it is set aside with a complete account of how it was made. That account decides what happens next.

  1. Detained by its module number

    Recipe number, actual power, speed and defocus, nitrogen flow, and every seam’s sequence number and timestamp travel with it.

  2. The record is read before anything is touched

    After this station a module cannot be taken apart without cutting. Adding heat before anyone knows what moved removes evidence instead of producing it.

  3. Repair weld to the original recipe

    By the engineer who holds recipe rights, to the recipe of the original part number — not adjusted on the spot.

  4. At acceptance: itemised, rectified, retested

    A criterion not met is recorded with the station, measured value and criterion beside it; only the failed items are retested.

10 working daysRetest of the failed items at acceptance is scheduled inside this window, by the engineer responsible for that criterion.

When a shift section comes back short

Same shape, a station wider: bracket back, hold what ran between, look at what actually moves.

Fixture conditionIncoming busbar lotTerminal surface out of station 11Then, and only then, re-weld
Engineering floor where a held module's weld record is read against its recipe
Read at a desk before anyone stands at the station.

Two measured runs, one set of documents

Acceptance Records for the Busbar Welding Station

Factory acceptance runs in our 6,000 m² assembly workshop, on one of three bays where the line is stood up in its shipping configuration with your cells, busbars, end plates, housings and cooling plates. Site acceptance repeats it on your floor.

Module line stood up in a pre-assembly bay for factory acceptance
FAT · OUR FLOOR

Four hours continuous, two to three working days

  • 4 hcontinuous run
  • 20modules sampled
  • 5packs, full test set

Your parts, with the recipes that will ship.

Site acceptance bench with weld samples pulled and the criteria list beside them
SAT · YOUR FLOOR

Eight hours at your takt, three to five working days

  • 8 hat target takt
  • ≥99%yield, equipment causes
  • ≥1000 Nweld samples pulled

Values printed beside criteria, station by station, both sides countersigned.

What you keep afterwards

  • The factory acceptance report
  • The site acceptance report, value beside criterion, station by station
  • An annotated station table
  • The end-of-line test item list
  • The recipe list, each recipe’s first-article sectioning record filed against it
  • How the eight steps run and what is signed at each: factory and site acceptance
Two years onEvery module welded after acceptance carries the same fields the acceptance modules carried. A weld argument two years from now is a question you look up.

Four inputs

Four Inputs to Specify Your Busbar Welding Station

With these, the reply carries the station scope, the fixture to be cut for your module, and how the first article would be qualified before anything runs in your line.

Module drawing

Envelope, terminal positions, row layout. A photograph of the print is enough to start.

Busbar part number, material and section

Copper or aluminium, thickness and width at the joint, plating if any.

Row configuration

Single-row, double-row, or both on the same line.

Target takt

Modules per hour at station 13, or the line PPM it has to keep up with.

Back inside 24 hours

  • Station scope: joint count, cycle content, single or double row
  • The fixture to be cut, and what it locates against
  • The first-article plan: samples, section, signatures

If hand welding fits better, we say so

If your volume and joint count point to hand or semi-automatic welding instead, that is a shorter conversation than discovering it after a line has been laid out. Write from the contact page; the reply comes inside 24 hours.
Gantry laser welder used to qualify the first article for your busbar welding station
Fixture plate holding a busbar assembly flat against the module face, the kind cut for each module type

How to reach you

[email protected]

Start with the joint

Send Your Module And Your Busbar

Four inputs to our engineering team and the station scope, the fixture to be cut and the first-article plan come back within 24 hours. Behind it: 26 engineers and 40+ line segments into 12 countries, on the about page.

Phone / WhatsApp
Address
Wuhan, Hubei, China
Response
Within 24 hours